Postingan

Menampilkan postingan dengan label black water

Plumbing Calculation

1.         INTRODUCTION 1.1.         Project Description This calculation covers the plumbing system for Office Building-B, Warehouse & Workshop and Electrical Building. Potable water will be supplied from Main line. While Black and Waste Water will be discharged to Septic tank. Then treated water will be directed to drainage by free flowing/gravity. 1.2.         References This calculations are based on the following documents: 1.2.1.      Standard and Codes : §   Uniform Plumbing Code 2000 (UPC 2000) §   International Plumbing Code 2009 (IPC 2009) §   National Plumbing Code 2006 (NPC 2006) §   Standar Nasional Indonesia (SNI) no. 03-7065-2005 Tata Cara Perencanaan Sistem Plambing §   Peraturan Menteri Negara Lingkungan Hidup Nomor 03 Tahun 2010 tentang Baku Mutu Air Limbah bagi Kawasan Industri §   P...